Demo Appliances Get a quote
ShopAboutServicesContactBlog ShopCart Log in Get a quote

Blog · 17 Oct 2026 · Sara Yousaf

Getting your UPS ready for summer load-shedding

Five checks before the hot months: battery water, terminals, load and ventilation.

  1. Top up tubular batteries with distilled water only.
  2. Clean and tighten the terminals.
  3. Add up what you run on backup: fans and lights, not the iron or the AC.
  4. Keep the UPS in a ventilated place, off the floor.
  5. Book an AMC visit: our technicians check charging and battery health.

#Tips #UPS

More from the blog