Getting your UPS ready for summer load-shedding
Five checks before the hot months: battery water, terminals, load and ventilation.
- Top up tubular batteries with distilled water only.
- Clean and tighten the terminals.
- Add up what you run on backup: fans and lights, not the iron or the AC.
- Keep the UPS in a ventilated place, off the floor.
- Book an AMC visit: our technicians check charging and battery health.